Church Growth and Activity

Is the church growing or shrinking?
Overall, it's growing.[2] However, in some places, the growth rate is flat.[3] In others, it is relatively high.[4]
But isn't the rate of growth declining?
Yes. The Church's growth rate has been declining for the past couple of decades, from a growth rate of 5%–10% in the late twentieth century down to a stable growth rate of about 1%–2% in the twenty-first century.[5]
Why has the Church's growth rate been declining?
Religious affiliation has been generally declining in the United States[6] and elsewhere.[7] Nearly all major religious organizations have declined in numbers in the U.S.[8]
Isn't most of the Church growth from children being born into the Church as opposed to converts?
No. For the past decade, the Church has had about a quarter-million convert baptisms each year, with the children of record reported by the Church in the low hundred thousand each year.[9]
Has the Church ever been the "fastest-growing religion"?
Possibly. The U.S. Census Bureau does not collect information on religion, so it's difficult to make comparisons with other religions.[10] The Church says it "makes no statistical comparisons with other churches" and "makes no claim to be the fastest-growing Christian denomination."[11]
What percentage of Church members are "active"?
The best current data from the U.S. General Social Survey indicates about 65% of U.S. members attend church once a week.[12] Worldwide membership activity is estimated to be around 30% from Reaching the Nations: International Church Growth Almanac, an unofficial Church almanac.[13]
How many new converts remain active?
Possibly 20%–50%, according to various third-party studies.[14] However, convert retention rates vary widely by geography[15] and by time measured.[16]
- Harold C.
“I have been in the church since 78 & I love it, tis the only church that is real & enlightened. The Father is watching over it & its members & the leadership is going by the spirit & I love it, the growth is doing as it should & our ward is growing rapidly so there! the gospel art” - Elaine B.
“Truth is eternal! Even if no one believed it, We don’t decide it. The Creator decided it! The universe is functioning on eternal true and laws. We have free agency to learn and benifit from truth. Free agency is our privilege of benefitting from truth. If we are wise.” - Scott C.
“The larger the church gets the harder it is to keep the same rate of growth, as the growth rate is calculated based on the current size divided into the new converts.” - Dutch M.
“It’s prophesied that our numbers are “small” compared to the world so, despite our true doctrine, the evil one is working as hard as we are to deceive and to thwart mankind’s understanding. No unhallowed hand can or will stop this work. This gives me great comfort.” - Daniel S.
“My Take? At age 75, I’m just a humble Life-long Member. The Earth is in the Final Countdown to The Glorious Reign Of JESUS during The Millennium‼️ The Prophet Russell M. Nelson stated: God does Not expect everyone on Earth needs to be a member of His Church right now., Don’t Worry”



about this topic